Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Aeros -->Connect–>AeLive>Connect–>Aeros LIVE


On Deployment of AIMAeros LIVE, we will turn on the Producer Sync process.  This will only need to be turned on once for each client.

    • This sync will not overwrite existing records in AIM Aeros LIVE if any were entered before the sync process, which may cause duplicates and things not going to correct place.  Tony created a script to join duplicates.  

In ERPAeros, Vendors must be assigned a vendor type; grower, producer, etc.

  Image Added

 


Currently, in the AAI AeConnect database, you have to set up the producer vendor types that should be pulled from ERP Aeros by updating the following table:  select * from ProducerVendorType.

    • The Vendor Type ID in the above table for producer is 16, since that is one that should be sync’d to AIMAeros LIVE, you will Add 16 into the table, as shown below.

 

 

 Now every time you go into the producer form in AIM, the sync will occur.

OR you can now do this in CONNECT under Sync Settings

Image Added

Image Added


The producer sync will be performed based on the schedule you set up through Scheduled Tasks

Image Added

Image Added


    • The greyed out information is what was brought over from ERPAeros, there is information in AIM Aeros LIVE that can be stored for producers that is not in ERP Aeros that users can still enter in the non-highlighted sections.

 Image RemovedImage Added